Huajiang Canyon Bridge — Full Lifecycle Health Monitoring
Case Overview
UW-FBG sensing arrays were deployed during bridge construction for full lifecycle structural health monitoring. Distributed strain and temperature measurement across the main girder and cable system provided real-time data for bridge management and maintenance decisions. As the world's highest bridge, the Huajiang Canyon Bridge demanded exceptional sensing performance in extreme environments.
Application Value
Full lifecycle monitoring from construction to operation, real-time structural health data for the world's highest bridge.






Other Cases
Explore more case studies in this application area

Bridge Cable Tension Monitoring
Bridges & Large Structures

Jinhai Bridge — 340m Box Girder Strain & Deflection Monitoring
Bridges & Large Structures

CFRP Smart Panel — Bridge Reinforcement Monitoring
Bridges & Large Structures

Historic Building Relocation — Dynamic Load Monitoring
Bridges & Large Structures

Tunnels & Underground Engineering
Browse case studies

Dams, Slopes & Hydraulic Engineering
Browse case studies

Energy & Power
Browse case studies

Railway & Transportation
Browse case studies

Industrial & Manufacturing
Browse case studies

Research & Other
Browse case studies
Related Products
Explore our product portfolio for complete sensing solutions
Have Questions? Talk to an Engineer
Our engineers are ready to discuss your UW-FBG sensing requirements and help design the right solution for your application.
Talk to an Engineer




